Project Gallery

Real Projects

55+ recent jobs · 12 categories · Across NJ

Category

Window Installation

8 projects in this category

Apartment building facade with blue-framed windows and curved balconies
Window Installation
Representative photo
Fort Lee 14 days 2025

Hudson Front Condo IGU Replacement — Fort Lee

Full IGU replacement for a 22-unit condo association on the Hudson palisades — original 2003 sealed units had failed, fogging, and Class B condensation throughout.

Replaced 88 IGUs over 14 working days. Specified Cardinal LoĒ-366 with 1/2 inch argon fill to handle the south-facing solar load and palisade wind exposure. Coordinated freight elevator scheduling, COI delivery, and after-hours work for occupied units. Building manager extended the contract to a second tower based on first-tower walkthrough results.

Brick-and-stone house with a two-car garage and arched upper windows
Window Installation
Representative photo
Garfield 3 days 2026

Two-Family Full Vinyl Replacement — Garfield

Full window replacement on a 1925 two-family home four blocks from our shop. Owner wanted energy savings without losing the original 6-over-1 grille pattern.

22 windows total across both units. Installed Andersen 100 Series Composite double-hung with simulated divided lite (SDL) grilles to match the original wood sash appearance. U-factor 0.27, SHGC 0.27 — well under NJ's IECC 2024 prescriptive requirements. Permit pulled from Garfield building dept; passed inspection on first walk.

Dark-stained wooden bay window with divided-lite sashes projecting from a stucco building
Window Installation
Representative photo
Ridgewood 5 days 2025

Bay Window Conversion — Ridgewood

Converted a single picture window to a 3-section bay window on a 1922 Tudor Revival in East Ridgewood. Added a window seat below.

Custom-built oak seat board with cushion-grade plywood substrate. Andersen 400 Series casement bay with copper roof cap to match existing trim. Structural header reinforced with LVL. Permit + inspection through Ridgewood building dept.

Modern white house with floor-to-ceiling sliding glass doors beside a pool, with a glass-railed roof terrace
Window Installation
Representative photo
Toms River 4 days 2026

Impact-Rated Window Replacement — Toms River (Post-Sandy)

Full impact-rated window package on a barrier-island Sandy rebuild. ASCE 7-22 wind loads required DP55 ratings on all openings.

PGT WinGuard 700 series impact windows — laminated 5/16 inch glass with SentryGlas interlayer, vinyl frame rated DP55. 18 windows + two sliding patio doors. Coordinated with the GC's elevation schedule; passed Ocean County code-required impact testing.

White bay window with decorative grilles under a tiled roof edge, seen from below against a blue sky
Window Installation
Representative photo
Elizabeth 32 days (phased) 2025

Multifamily Apartment IGU Replacement — Elizabeth

Phase-1 replacement of 64 IGU sashes across a 1980s 24-unit apartment building. Original units were beyond seal life and tenants were complaining of drafts.

Spec'd Sunrise Vinyl with Low-E270 glass. Worked unit-by-unit with property management for tenant access. Each unit completed within a single day to minimize tenant disruption. Phase 2 (remaining 88 IGUs) scheduled following spring.

Precision Windows & Roofing installer in a branded hi-vis vest finishing a large three-lite picture window with flanking units on a board-and-batten Passaic, NJ home
Window Installation
Passaic 1 day 2026

Picture Window & Flanker Replacement — Passaic

Installed a large center picture window with two flanking units on a Passaic home — maximizing the glass area and the view while sealing out drafts.

The center fixed lite carries the view; the flankers were set to match sightlines and trim. Fixed picture windows have no operating hardware to fail, so they hold their seal and insulation value longer than operable units — the right call for a big wall of glass. Fully flashed and insulated to NJ code, trimmed inside and out.

White half-round arched Palladian window over two rectangular units in the stucco gable of a Fair Lawn, NJ home, installed by Precision Windows & Roofing
Window Installation
Fair Lawn 1 day 2026

Arched Palladian Window — Fair Lawn

Installed a half-round arched (Palladian-style) window over paired rectangular units in a Fair Lawn gable — a specialty shape that has to be templated, not ordered off a shelf.

Arched and radius windows are cut to the exact curve of the opening; a stock rectangle won't fit and a bad template shows from the street. We field-measured the radius, matched the frame color to the existing units below, and set it flush in the stucco gable. Specialty-shape glazing like this is where a glass-first shop has the edge over a volume installer.

Old three-pane steel basement window with cracked glass held together by blue tape, set in a painted concrete block wall
Window Installation
Westwood Before 2026

Old Steel Basement Window, Cracked and Taped — Westwood, NJ

The basement window before we started: three old steel-framed panes, a cracked pane held together with blue tape and a sill gathering dirt.

Basement windows get the least attention in a house, so a failed one often just gets taped. Here the glass is cracked across the lower corners and the tape is the only thing holding the pieces in the frame. Tape is not a seal: a window in this state keeps out neither drafts nor water, and nothing about it can be opened and closed safely. This is the opening as we found it, before the old unit came out.

New white vinyl hopper basement window with a latch at the top, trimmed and sealed in the same block-wall opening
Window Installation
Westwood Completed 2026

New Hopper Basement Window in the Same Opening — Westwood, NJ

The same Westwood basement opening with a new white vinyl hopper window, trimmed and sealed into the block wall.

A hopper window hinges at the bottom and tips inward from the top, which suits a basement opening where a swinging sash would have nowhere to go. The latch sits at the top of the sash. The new unit goes into the existing opening with trim around it and sealant between the frame and the block, so the cracked, taped glass from the before photo is replaced by a window that opens, closes and latches.

Category

Glass Showers

1 project in this category

Frameless glass shower enclosure with black hardware
Glass Showers
Representative photo
Hoboken 1 day 2026

Frameless Shower Enclosure — Hoboken Brownstone

Custom frameless shower enclosure in a fully renovated 1890s Hoboken brownstone master bath. Out-of-square walls required custom-templated panels.

3/8 inch tempered low-iron Starphire glass, EnduroShield easy-clean coating, brushed nickel hardware. Old wall surfaces were 1.25 inches out of plumb over the 78 inch height — we templated on-site, fabricated to spec, and the result fit with no shimming. Single-day install once panels arrived.

Category

Commercial Leak Repair

1 project in this category

Office building glass curtain wall between dark spandrel panels, reflecting a building under construction
Commercial Leak Repair
Representative photo
Newark 6 days 2025

Class A Office Curtain-Wall Reseal — Newark

Property manager called after recurring water intrusion at the 14th floor — three previous contractors had recaulked without resolving the leak.

ASTM E1105 spray-rack testing identified the actual source two floors up at a parapet coping detail — water was traveling horizontally inside the EIFS for 18 feet before exiting at the window head. Rebuilt the parapet flashing with self-adhered membrane and re-set 110 linear feet of perimeter sealant in Dow 795. Covered by our 10-year transferable workmanship warranty; no recurrence after one full storm season.

Category

Historic Restoration

3 projects in this category

Divided-lite double-hung wood window in a weathered green-painted frame on a cream wall
Historic Restoration
Representative photo
Princeton 21 days 2025

Historic Wood Sash Restoration — Princeton

Restoration of 14 original 1880s wood double-hung windows on a Western Section Princeton home. HPC required keeping the original sash and using restoration glass.

Removed each sash for shop restoration: stripped old paint, scarfed in dutchman repairs at sill rot, re-glazed with restoration glass, set with traditional linseed-oil putty (not modern compound), reinstalled with new sash cord and pulleys. COA review and approval through the Princeton HPC.

Weathered white-painted wood windows with divided panes and stone sills in a textured red wall
Historic Restoration
Representative photo
Cape May 12 days 2025

Victorian Restoration with Restoration Glass — Cape May

Eight original 1880s windows restored on a Cape May Historic District B&B. National Historic Landmark District requires period-appropriate restoration.

Restoration glass (3/32 inch, with waviness matching 1880s cylinder glass), reglazed with linseed-oil putty per HPC standards. Two new replicate sashes built to match originals where rot was beyond repair. 8-week COA approval timeline factored into project plan.

Technician holding a suction-cup glass lifter at a stained-wood window opening, on site in New Jersey
Historic Restoration
North New Jersey Same day 2026

Wood Sash Re-Glazing — On Site

Re-glazing a wood sash in place — the repair that saves an original window instead of replacing it.

Old wood sash fails at the glazing long before the wood itself goes. Once the putty dries out and cracks away, the glass loosens and water gets into the rabbet, and that's what actually rots the sash. Raking out the old compound and re-glazing restores the seal and buys decades — far cheaper than a replacement unit, and it keeps the original window.

Category

Storefront Glass

4 projects in this category

Clothing boutique interior with shelving, clothes racks and pendant lamps
Storefront Glass
Representative photo
Asbury Park 2 days emergency 2026

Boardwalk Storefront Reglaze — Asbury Park

Cookman Avenue retail tenant needed full storefront reglaze after a vehicle impact closed the shop on a Saturday in peak season.

Emergency board-up Saturday afternoon; full reglaze with 1/2 inch tempered glass in the existing aluminum framing completed Sunday before Monday open. Tenant lost zero additional days. We shipped two panels overnight from our supplier to make the timeline.

Shattered glass panel with an under-repair sign on a chain-link fence behind it
Storefront Glass
Representative photo
Passaic 12 hours 2026

Emergency Storefront Board-Up — Passaic

Emergency call at 11pm for a Main Avenue retail tenant — full storefront panel down. We had it boarded by midnight and reglazed by 9am next morning.

Emergency board-up with treated 3/4 inch plywood and lag bolts. Replacement panel: 1/4 inch tempered with custom-cut to fit the existing 1980s storefront framing (no system-match needed since framing was intact). Tenant opened on time the next morning.

Office corridor lined with black-framed glass partition walls
Storefront Glass
Representative photo
Hackensack 4 days 2026

Medical Office Tenant Glass Fit-Out — Hackensack

New medical practice fit-out near HUMC — interior office glass partitions and a custom entry door.

Three full-height glass partitions with 3/8 inch tempered glass and matte-black aluminum framing. ADA-compliant door closer on the entry. After-hours installation to coordinate around clinical operations.

Aluminum-framed commercial storefront glass entry door with overhead closer and keypad lock on a red-brick Paterson, NJ building, serviced by Precision Windows & Roofing
Storefront Glass
Paterson 1 visit 2026

Commercial Storefront Glass Door — Paterson

Serviced a commercial aluminum storefront entry door on a Paterson building — the full-lite glass, closer, and hardware that a business relies on every day.

Storefront doors take constant traffic: the glass, the overhead closer, the mid-rail, and the locking hardware all wear. We handle the glass and door as one system so the entrance seals, closes, and locks correctly — and board up same-day when a shopfront breaks so the business stays secure until the replacement lite is fabricated.

Category

Glass Railings

1 project in this category

Glass balcony railings with metal posts on a white apartment building
Glass Railings
Representative photo
Jersey City 3 days 2026

Roof-Deck Glass Railing — Jersey City Brownstone

44 linear feet of frameless tempered glass railing on a Hamilton Park brownstone roof deck. Replaced original wrought iron that had rusted through.

5/8 inch tempered laminated glass set in stainless steel base shoe (CR Laurence B5S). Wind load calc per ASCE 7-22 NYC zone. Permit through JC building dept. Final result: unobstructed Manhattan skyline view from the deck.

Category

Glass Repair

1 project in this category

Precision technician replacing the fixed glass panel of a sliding patio door on a Clifton, NJ home — shattered tempered glass cleared onto a drop cloth below the new pane
Glass Repair
Clifton Same day (after glass fabrication) 2026

Sliding Patio Door Glass Replacement — Clifton

Replaced the shattered fixed panel of a sliding patio door on a Clifton home — glass only, keeping the existing door frame and track.

Measured the failed panel, fabricated a matching tempered safety-glass unit to the original spec, and set it in the existing frame. Old glass was fully cleared from the sill and landscaping, and the door was reset to glide and lock before we left. Glass-only replacement like this avoids the cost of a whole new patio door when the frame and track are sound.

Category

Door Installation

1 project in this category

Contemporary flush black door with a stacked column of four rectangular glass vision lites on a modern stucco Garfield, NJ home, by Precision Windows & Roofing
Door Installation
Garfield 1 day 2026

Modern Glass-Lite Door — Garfield

Set a modern flush door with a stacked column of rectangular glass vision lites on a contemporary Garfield home — the glasswork that makes a modern entrance read clean.

The look on a modern door lives in the glass: evenly-spaced tempered vision lites, tight even reveals, and a flush finish with no visible fasteners. We fabricated and set the lites to line up dead-straight and sit flush in the slab. Two blocks from our shop — Garfield is home turf.

Category

Roof Replacement

21 projects in this category

Cape cod in Teaneck, New Jersey after a full roof replacement in dark architectural asphalt shingle, with new black gutters, downspouts and fascia trim running the eaves and both gable rakes
Roof Replacement
Teaneck Multi-day 2026

Roof Replacement, New Gutters & Fascia Trim — Teaneck, NJ

Teaneck cape cod: roof replacement in dark architectural shingle, with new gutters, downspouts and fascia trim done in the same visit.

Three trades that belong in one visit. The fascia is the board the gutter hangs off, so the order matters: you cannot hang a straight gutter on soft fascia, and you cannot get at the fascia cleanly once the gutter is back up. Replacing the roof without touching either is how a job looks finished from the street and starts pulling away from the house in two winters. Here the shingle field went on first, then the fascia was trimmed out along the eaves and up both gable rakes, then the gutters and downspouts were hung and returned in black to match. A cape cod is also steeper than it looks from the kerb, and the front gable over the entry means the field is cut and capped twice on a small roof — there is nowhere to hide a crooked course on an elevation this narrow. Teaneck's housing stock is full of these 1940s and 50s capes, and they nearly all reach the same point at the same time: the roof and the trim behind the gutter go together.

Precision crew tearing a two-family New Jersey roof down to the original rafters and laying new plywood decking, with a dumpster staged at the curb
Roof Replacement
North New Jersey Multi-day 2026

Two-Family Roof Tear-Off & Re-Deck

Full tear-off on a two-family that went all the way down to the original rafters — the old decking couldn't be shingled over, so it was replaced before any new roof went on.

Once the shingles came off, the deck underneath was too far gone to fasten to. Shingling over bad decking is how a roof fails early: the nails never get a solid bite and the field telegraphs every soft spot. New plywood went down over the rafters first, then underlayment, then the shingle field. A dumpster staged at the curb kept the tear-off debris off the property.

Completed light grey architectural asphalt shingle hip roof on a Rutherford, NJ home, ridge cap running up to the peak where the roof meets a two-tone sided wall
Roof Replacement
Rutherford Multi-day 2026

Hip Roof Shingle Replacement — Rutherford

Architectural shingle over the hip end of a Rutherford home, finished up to the wall the lower roof runs into. Shown finished from the field side below.

A hip end has no simple gable to hide behind — two planes climb to a single peak and every course has to be cut to the hip and capped straight, or the line reads crooked from the street. This one also dies into the wall of the storey above it, which is the detail that decides whether the roof lasts: water shed off the upper wall lands on that junction, so it is flashed before the field goes on rather than sealed afterward.

Finished light grey architectural asphalt shingle roof plane on a Rutherford, NJ home, with new white drip edge along the eave above the driveway
Roof Replacement
Rutherford Multi-day 2026

Architectural Shingle Roof — Rutherford

The same Rutherford roof from the other side — the finished shingle field, with new drip edge run along the eave.

Shot down-slope over the driveway, so the eave detail is visible: the white line along the bottom edge is new drip edge. It is required by code on a re-roof, it is cheap, and it is one of the first things left off when a job is being priced down — which is why the edge of a roof is worth looking at before you sign anything. Without it, run-off wicks back under the first course and rots the deck edge where nobody sees it until the fascia goes soft. Between this frame and the hip shot, you can see the whole roof: how the planes are cut and capped up top, and how the field is terminated at the bottom.

Completed architectural asphalt shingle hip roof on a two-family New Jersey home after a full tear-off and new decking
Roof Replacement
North New Jersey Multi-day 2026

Completed Hip Roof — Architectural Shingle

The same two-family, finished — architectural asphalt shingle over a fully re-decked hip roof.

A hip roof has more field seams than a simple gable: four planes meeting at hips that all have to be cut and capped straight. Architectural shingle carries a hip roof well because the heavier tab pattern hides the plane transitions instead of highlighting them. The whole deck under this field is new.

Roofing crew stripping old asphalt shingles down to the bare deck on a New Jersey split-level, with tarps protecting the landscaping below
Roof Replacement
North New Jersey Multi-day 2026

Split-Level Tear-Off — Property Protected

Stripping a split-level down to bare deck — tarps go down before the first shingle comes off.

Tear-off is the messiest hour of any roof job, and it's where most of the complaints come from: shingle chunks in the beds, nails in the driveway, debris in the gutters. Tarping the landscaping and staging the drop zone before anything comes off is the difference between a clean handover and a week of picking nails out of the lawn.

Precision crew installing new roof decking and underlayment over a large New Jersey colonial after a full tear-off
Roof Replacement
North New Jersey Multi-day 2026

Roof Decking & Underlayment — Colonial

New decking and underlayment going down on a colonial — the layer nobody sees once the shingles are on.

An open roof is the only chance to see what's actually under the shingles: soft decking, old penetrations, valleys that were never flashed right. Everything gets inspected and corrected while the deck is exposed, because once the field is closed in, reopening it costs more than doing it now.

Completed architectural asphalt shingle roof on a large New Jersey colonial, with skylights and a masonry chimney tied into the new shingle field
Roof Replacement
North New Jersey Multi-day 2026

Completed Colonial Roof — Skylights & Chimney

The finished colonial — skylights and a masonry chimney tied back into the new shingle field.

Penetrations are where roofs leak. Skylights and a masonry chimney on the same slope mean multiple flashing details that all have to shed water into the field rather than trap it. Getting those transitions right is the whole job — the shingles themselves are the easy part.

Precision Windows & Roofing crew fastening new plywood roof decking across a stripped slope during a re-roof on a Saddle River, NJ home
Roof Replacement
Saddle River Multi-day 2026

Full Roof Deck Re-Sheathing — Saddle River, NJ

Full tear-off down to the framing with the entire deck re-sheathed in new plywood before a single shingle went on.

Once the old roof is off, the deck is the part nobody sees and everything else depends on. Here the original sheathing was replaced across the whole slope rather than patched, which is what lets fasteners hold their design withdrawal strength — a nail into delaminated or punky sheathing does not, no matter how good the shingle above it is. Every crew member is tied off, and the deck was swept and inspected before underlayment.

Hip roof mid tear-off with fresh plywood decking on the upper slope and a ladder hoist staging materials, Saddle River, NJ
Roof Replacement
Saddle River Multi-day 2026

Hip Roof Tear-Off & Re-Deck — Saddle River, NJ

A hip roof caught mid-changeover — old shingles off the upper slope, new decking down, materials coming up by ladder hoist.

Tear-off is staged so no section of deck sits open overnight. The ladder hoist matters more than it looks: running materials up mechanically keeps weight off the finished work and keeps the crew's hands free on the roof. Drip edge stock is staged along the eave here, which goes on before the underlayment at the eave and over it at the rake.

New plywood roof decking run tight to a brick chimney during a re-roof on a Saddle River, NJ home, old roofing stripped to the right
Roof Replacement
Saddle River Multi-day 2026

Re-Decking Around a Brick Chimney — Saddle River, NJ

New decking run tight to the chimney on a re-roof — the stage where a chimney leak is either solved or sealed in for another twenty years.

A chimney is the single most common place a roof leaks, and the reason is almost always what happens at this stage. Decking has to run true to the masonry so the flashing that follows sits flat against brick instead of bridging a gap. Old roofing was stripped back well past the chimney rather than cut around it, which is what lets the new step flashing weave course by course instead of being caulked over the top of the old work.

Completed architectural shingle roof at sunset with new chimney flashing, a box vent and new pipe boots on a Saddle River, NJ home
Roof Replacement
Saddle River Multi-day 2026

Completed Architectural Shingle Roof — Saddle River, NJ

A finished architectural shingle roof — chimney flashed, box vent and pipe boots set into the new field.

Everything that penetrates a roof is a place it can leak, so the boots and vents get replaced with the field rather than reused. What you can see here is the whole assembly working together: shingles laid into the valley, new metal at the chimney, and the exhaust and plumbing penetrations each sealed on their own terms instead of relying on one bead of caulk.

Architectural shingle field with ridge cap being installed along the hip and a new pipe boot, on a Saddle River, NJ roof at dusk
Roof Replacement
Saddle River Multi-day 2026

Architectural Shingles & Ridge Cap — Saddle River, NJ

Ridge cap going on over a finished architectural shingle field, with new pipe boots set into the courses.

The ridge and hips are where a roof is closed out, and they are laid last for a reason — cap shingles have to lap into the prevailing weather and cover the cut ends of the field on both sides. The pipe boots visible here were set as the courses ran past them, so the shingles lap over the top flange and under the bottom, which is what keeps water on top of the roof instead of behind the flange.

Freshly laid charcoal architectural asphalt shingles running down the hip of a Parlin, NJ roof, with the tear-off dumpster, ladder and tarped landscaping visible in the yard below
Roof Replacement
Parlin Multi-day 2026

Architectural Shingle Hip Roof — Parlin

Charcoal architectural shingles over a full tear-off on a Parlin home, shot down the hip while the field was still being run and the new gutter stock was staged on the roof.

Two things in this frame matter more than the shingles. The first is the dumpster below — this was a tear-off, not an overlay. A second layer laid over a first is legal in New Jersey up to two total, and it is cheaper, but it buries whatever the deck is doing and adds weight to a structure sized for one layer. The second is the black tarp over the planting bed. Tear-off debris falls where gravity sends it, and beds and shrubs are what get wrecked on a roof job. Along the right edge you can see new white gutter stock already staged on the finished slope, so the gutters went on as the roof closed out rather than as a return trip weeks later.

Finished charcoal architectural shingle roof on a shake-sided Cape in Parlin, NJ at dusk, with the white scalloped gable accent kept and a new white gutter run along the eave
Roof Replacement
Parlin Multi-day 2026

Completed Roof Replacement — Parlin Cape

The same Parlin roof from the street once it was done — charcoal architectural shingles, a new gutter line along the eave, and the original scalloped gable left as it was.

The front gable is the detail worth looking at. Its white scalloped shingle face was existing and stayed, which meant the new roof had to die cleanly into it on both slopes instead of being run past it and caulked. That junction and the bay-window roof below it are the two places on a house this shape where water is most likely to find a way in, and both are flashed as the courses run rather than sealed after the fact. The white line under the eave is new gutter — the same stock staged on the roof in the other frame — so the roof and the drainage that protects it were finished together.

Precision crew on a Lodi, NJ roof laying synthetic underlayment over fresh plywood decking, with GAF shingle bundles staged along the ridge
Roof Replacement
Lodi Multi-day 2026

Roof Replacement — Lodi Two-Family

Full tear-off and re-roof on a brick two-family in Lodi, shot mid-job with underlayment going down over new plywood and the shingle bundles staged along the ridge.

This is the frame worth asking any roofer for on your own house. Once the underlayment is rolled the deck is invisible, and by the next morning it is under shingle — so the plywood in this photo is the only evidence that anyone looked at the sheathing before covering it. Bundles are spread along the ridge rather than stacked in one place, which keeps a point load off a deck that was just re-nailed and means the crew is not walking finished shingle to fetch the next bundle.

Completed tan architectural shingle hip roof on a brick two-family in Lodi, NJ, with new white seamless gutters run along the eave
Roof Replacement
Lodi Multi-day 2026

Completed Roof & Seamless Gutters — Lodi

The same Lodi building closed out — tan architectural shingle over a full tear-off, hips capped, and new seamless gutters run along the eave in the same visit.

Roof and gutters were one job here, which is the part worth noticing. Drainage is what protects a new roof, and running it as a separate trip weeks later leaves the eave detail unfinished in between. The white line under the shingle edge is new drip edge — required on a re-roof, cheap, and one of the first things dropped when a quote is being cut to win on price. Ask to see the eave on anything you are comparing.

Completed gray architectural asphalt shingle roof and new white gutters across several gables of a brick colonial in Franklin Lakes, NJ, with a metal-roofed bay window below
Roof Replacement
Franklin Lakes Completed 2026

Roof Replacement & New Gutters on a Brick Colonial — Franklin Lakes, NJ

A finished architectural asphalt shingle roof and new gutters on a brick colonial in Franklin Lakes, photographed from the front lawn by our crew after the job.

A front elevation like this one is mostly roof edges: gables that step in and out, a bay window with its own small metal roof, and short shingle runs that die into brick walls. Every one of those junctions is a place water can get behind a roof, which is why a colonial with this many planes is worth judging on its transitions, not its main field. When you compare quotes on a house shaped like this, ask how the walls, gable ends and bay roof are being flashed, because the flat open slope is the easy part. The gutters went on in the same job, so the roof edge and the drainage under it were finished together rather than on a second trip.

Steep front gable and main roof field of new gray architectural shingles above an oval window on a brick colonial in Franklin Lakes, NJ
Roof Replacement
Franklin Lakes Completed 2026

Completed Roof, Front Gables — Franklin Lakes, NJ

The steep front gable and the main roof field of the same Franklin Lakes colonial, with new architectural shingles running into the brick above an oval window and a new gutter along the eave.

The steep gable on the left and the lower main field meet along a valley, and the shingle courses on both sides have to line up across it. Look at how straight the courses run down the gable face and across the field: on a colonial this size the eye reads crooked rows from the street long before anyone notices a nail line. A steep pitch also sheds water fast, which is why the work that matters on a roof like this is at the edges and the brick, not in the middle of the slope.

Rear of a Franklin Lakes, NJ home seen through pine branches: new gray architectural shingles around a brick chimney, with vinyl siding and an arched window below
Roof Replacement
Franklin Lakes Completed 2026

Re-Roofed Rear Roof Lines Beside the Chimney — Franklin Lakes, NJ

The back of the Franklin Lakes house, shot through the pines: new architectural shingles on the rear roof lines around a brick chimney, above vinyl siding and an arched window.

Franklin Lakes is heavily wooded and the back of this house shows it, with white pine branches hanging right over the roof. Trees that close change what a roof has to put up with: needles and debris that sit in valleys and against a chimney, and shade that keeps a slope damp longer than a sunny one. The chimney is the other thing to look at in this frame. It is where a roof meets masonry that moves differently from the framing, so it is one of the first places to check on any roof, new or old.

Roofer in a safety harness at the peak of a front gable in Passaic, NJ, with old asphalt shingles half stripped from the roof beneath overhead service wires
Roof Replacement
Passaic Tear-off in progress 2026

Old Shingles Stripped From a Front Gable — Passaic, NJ

A roof replacement under way on a Passaic house: the old asphalt shingles are partly stripped off the front gable and a crew member, tied off in a harness, works along the ridge.

This is the tear-off stage, so the roof is not finished and the frame shows exactly that: loose shingle pieces, torn edges and bare patches where the old roof is coming off. The overhead service wires run right across the slope, which is one more thing a crew has to work around at the eave and gable. A tear-off is also the point where the deck underneath can be looked at directly, before any new roofing goes down.

Cape Cod house in Passaic, NJ with the old roof partly stripped, two ladders against the eaves and blue tarps spread over the front lawn and shrubs to catch debris
Roof Replacement
Passaic Tear-off in progress 2026

Tarps Over the Lawn During a Roof Tear-Off — Passaic, NJ

The front of the same Passaic house during the tear-off: ladders up to the eaves, two crew members on the roof, and blue tarps laid over the lawn and shrubs below.

Old shingles and nails come off a roof in volume, and most of it lands in the yard unless something is there to catch it. The blue tarps on the lawn and around the shrubs are that something, and a green roll-off dumpster is parked at the left edge of the frame for the debris. The job is still in progress here, with the old roof half removed, so nothing in this photo shows the finished roof.

Four roofers in safety harnesses stripping old asphalt shingles down to the bare wood deck around a brick chimney on the back of a Passaic, NJ house, seen past a trampoline net
Roof Replacement
Passaic Tear-off in progress 2026

Harnessed Crew Stripping to the Deck at a Chimney — Passaic, NJ

The back of the Passaic house: four roofers in harnesses strip the old shingles down to the bare wood deck around a brick chimney.

Where the shingles have come off, the wood deck shows through as orange-brown boards around the chimney. That is the point of a full tear-off instead of a layover: the surface the new roofing will sit on is exposed and can be checked board by board. Each roofer in the frame is wearing a harness.

Finished dark grey architectural asphalt shingle roof on a Cape Cod house in Passaic, NJ, seen from the front walk, with the front gable over the entry stoop and a shrub with red berries by the windows
Roof Replacement
Passaic Completed 2026

Finished Roof Replacement on a Cape Cod — Passaic, NJ

The Passaic Cape Cod from the tear-off cards, finished: a full dark grey architectural shingle roof from eave to ridge, photographed from the same front walk three days later.

Put this card next to the tarps-and-ladders frame and the change is the whole roof. The torn shingle edges, loose pieces and bare patches are gone, and the main roof and the small front gable over the stoop now share one continuous surface of dimensional shingles with straight courses along the eave. The tarps, ladders and debris are cleared off the lawn as well.

Front gable of a Cape Cod in Passaic, NJ under new dark grey asphalt shingles, white gable trim below and a capped chimney showing over the ridge
Roof Replacement
Passaic Completed 2026

New Shingles Around the Front Gable — Passaic, NJ

A closer look at the front of the finished Passaic roof, where the small gable over the entry meets the main slope.

The two sloped edges of that front gable run into the main roof, and those lines are where a careless shingle job shows first: crooked courses, gaps, or tabs that do not line up on either side. Here the courses run straight across both faces and the gable trim sits clean beneath them. The chimney cap on the far side of the ridge is just visible at the top of the frame.

Back slope of a finished asphalt shingle roof in Passaic, NJ, with a capped brick chimney and two vent pipes coming up through metal flashing collars near the eave
Roof Replacement
Passaic Completed 2026

Back Slope, Chimney and Vent Pipes After Reroofing — Passaic, NJ

The back of the Passaic house after the reroof: the slope where the crew stripped to the deck around the chimney is now fully shingled, with two vent pipes coming through it.

Every pipe that pokes through a roof is a hole the new shingles have to seal around. On this slope the two vent pipes each come up through a metal flashing collar that sits on the shingles, one just under the chimney and one near the eave. The brick chimney itself wears a metal cap. This is the same slope shown bare in the harnessed-crew tear-off frame.

Rear of a Cape Cod in Passaic, NJ with its completed dark grey shingle roof, a brick chimney and vent pipes along the back slope, seen from the yard beside the deck
Roof Replacement
Passaic Completed 2026

Completed Roof Seen From the Back Yard — Passaic, NJ

From the corner of the back yard, the whole rear slope of the finished Passaic roof is in view, chimney to gable end.

Shot from low in the yard, this angle takes in the full length of the rear slope: from above the deck at one end to the gable wall at the other, with the chimney and the small vent pipes spaced along it. Most of this slope cannot be seen from the street at all, so a back-yard photo is the only way to show that the new shingles cover it end to end.

Category

Chimney & Siding

2 projects in this category

Rebuilt chimney chase wrapped in vinyl siding to match the house, with a new chase cover on top, on a New Jersey home
Chimney & Siding
North New Jersey Multi-day 2026

Chimney Chase Rebuild — Framed & Re-Wrapped

A chimney chase rebuilt from the framing up around the existing flue, then wrapped in siding to match the house.

A framed chase is a wood box around a metal flue — when the cover or the siding above the roofline fails, water gets into the framing and the box rots from the inside. This one was rebuilt with new framing and sheathing around the existing flue, then re-wrapped in siding to match the house with a new cover on top so the whole assembly sheds water again.

New metal chimney cricket and saddle flashing formed above a brick chimney on a completed shingle roof, Saddle River, NJ
Chimney & Siding
Saddle River Multi-day 2026

Chimney Cricket & Saddle Flashing — Saddle River, NJ

A fabricated metal cricket on the up-slope face of a chimney — the detail most re-roofs skip and most chimney leaks come back to.

Water running down a slope hits the back of a chimney and stalls there, and on a wide chimney it pools until it finds a way in. A cricket is a small peaked structure built on the ridge side of the chimney that splits that water and sends it around both sides. It is a code requirement, not an upgrade: IRC R903.2.2 calls for a cricket or saddle on the ridge side of any chimney or penetration more than 30 inches wide, measured perpendicular to the slope. We form the metal on site so it fits the actual masonry rather than approximating it with sealant.

Category

Water Damage Repair

2 projects in this category

Ceiling in a Jersey City, NJ home opened up after a water leak, with the wood joists and the boards above exposed and torn drywall around the edges
Water Damage Repair
Jersey City Completed 2026

Leak-Damaged Ceiling Before the Repair — Jersey City, NJ

A ceiling in a Jersey City home after a leak from above, open to the joists with torn drywall around the edges, photographed by our crew before the repair.

Water that sits on top of a ceiling soaks the drywall until it sags and tears, and the board around the hole can stay wet well past where the paint still looks fine. That is why a leak repair starts by cutting back to sound, dry board rather than patching the hole you can see. An opening this size also shows the joists and the boards above them, which is where you can see whether the water reached the framing before anything is closed in. A second, smaller hole at the edge of the ceiling in the same room was repaired on the same visit.

The ceiling of a Jersey City, NJ room after a leak repair, the opening closed, taped and skim-coated with joint compound, ready for paint
Water Damage Repair
Jersey City Completed 2026

Ceiling Patched and Skim-Coated After a Leak — Jersey City, NJ

The same room after the repair: the ceiling closed, taped and skim-coated with joint compound, ready for primer and paint.

This frame is the stage between the repair and the paint: the opening is closed, the seams are taped and the area is skim-coated, and it still has to be sanded smooth before any primer goes on. If you are finishing a ceiling that took on water yourself, use a stain-blocking primer under the paint. Leak stains bleed through ordinary ceiling paint, often weeks after the ceiling looked done. The smaller hole at the edge of the ceiling in the same room was patched flush on the same visit.

Category

Drywall Repair

1 project in this category

A square drywall patch screwed into a cut-out in an interior wall in a Woodland Park, NJ home, with the screw holes visible in the wall around it
Drywall Repair
Woodland Park Patch installed 2026

Wall Hole Patched With New Drywall — Woodland Park, NJ

A hole where something had struck an interior wall, cut back to a clean square and closed with a new piece of drywall, photographed by our crew before any tape or compound went on.

A patch needs something to hold it. The screw holes around the cut-out show how the new piece is fastened to what is behind the wall, so it sits flush with the wall instead of floating on its edges. Nothing is hidden yet at this stage: the seams are bare and the screw holes still have to be filled with compound before the wall can be sanded and primed.

An interior wall in a Woodland Park, NJ home skim-coated with grey joint compound well beyond the drywall patch and feathered out at the edges
Drywall Repair
Woodland Park Skim coat 2026

Wall Skim-Coated Wide Over a Drywall Patch — Woodland Park, NJ

The same wall after the patch was taped and skim-coated, with the compound spread well past the patch and thinned out toward the edges.

The coat is much wider than the hole on purpose. Compound spread only as far as the patch dries as a raised square that shows once the wall is painted, so it is thinned gradually into the surrounding wall, a process called feathering. It still has to be sanded smooth before primer.

An interior wall in a Woodland Park, NJ home after sanding and primer, the patched area smoothed and ready for final paint, with a thermostat on the wall above
Drywall Repair
Woodland Park Primed 2026

Drywall Patch Sanded and Primed — Woodland Park, NJ

The same wall after sanding and primer: the patched area is smooth and sealed, and the final coat of paint is still to come.

Primer comes before paint on a patch because compound soaks up paint faster than the old wall around it, which leaves a dull, blotchy spot that stays visible even under a good topcoat. Sealing the repair first gives the paint one even surface to sit on. This frame is that stage, so the wall is not finished: the primed patch still looks different from the wall around it until the final coat goes on.

Your Project Next?